Phase 1 Site entrance with landscape materials
Mayo Hollow sediment pond
Landscape materials in new grass cover
Site entrance landscape materials
Steep slope Hawthorn tree planting
Phase 1 Site entrance with landscape materials
7/11/2008
32.55 Kb
Mayo Hollow sediment pond
7/11/2008
39.18 Kb
Landscape materials in new grass cover
7/11/2008
29.01 Kb
Site entrance landscape materials
7/11/2008
31.94 Kb
Steep slope Hawthorn tree planting
7/11/2008
35.06 Kb
Safety screens on culvert entrances
Vegetation on second bench
Sumac species in seeding mixture on benches
Concrete gutter capturing debris
Phase 1 grass cover
Safety screens on culvert entrances
7/11/2008
39.35 Kb
Vegetation on second bench
7/11/2008
38.01 Kb
Sumac species in seeding mixture on benches
7/11/2008
40.43 Kb
Concrete gutter capturing debris
7/11/2008
36.46 Kb
Phase 1 grass cover
7/11/2008
27.89 Kb
Vegetative cover on benches
Circle area grass cover
Vegetative cover on lower bench
Grass cover on Phase 1 site
Entrance sidewalk with new grass cover
Vegetative cover on benches
7/11/2008
43.48 Kb
Circle area grass cover
7/11/2008
29.56 Kb
Vegetative cover on lower bench
7/11/2008
37.57 Kb
Grass cover on Phase 1 site
7/11/2008
23.79 Kb
Entrance sidewalk with new grass cover
7/11/2008
27.93 Kb
Plantings and entrance sign at Phase 1 site
Plantings along sidewalk into Phase 1 site
Phase 1 site access road entrance
Landscaping at site entrance
Landscape plantings near Phase 1 site entrance
Plantings and entrance sign at Phase 1 site
3/6/2008
39.01 Kb
Plantings along sidewalk into Phase 1 site
3/6/2008
36.99 Kb
Phase 1 site access road entrance
3/6/2008
25.26 Kb
Landscaping at site entrance
3/6/2008
44.83 Kb
Landscape plantings near Phase 1 site entrance
3/6/2008
38.48 Kb
Phase I site from Route 1428
Phase 1 site entrance
Portion of the crowd at the ceremony
Ms. Jerica Blair sings the national anthem
Mayor Robinson addresses the crowd at the ceremony
Phase I site from Route 1428
1/24/2008
25.57 Kb
Phase 1 site entrance
1/24/2008
22.3 Kb
Portion of the crowd at the ceremony
11/12/2007
37.67 Kb
Ms. Jerica Blair sings the national anthem
11/12/2007
34.48 Kb
Mayor Robinson addresses the crowd at the ceremony
11/12/2007
31.26 Kb
Doc Marshall Judge Executive speaks at the ceremony
Dignitaries prepare for the ribbon-cutting ceremony
Congressman Rogers speaking at the ribbon-cutting ceremony
Colonel Dana Hurst speaks at the ribbon-cutting ceremony
City of Martin City Council at the ceremony
Doc Marshall Judge Executive speaks at the ceremony
11/12/2007
33.56 Kb
Dignitaries prepare for the ribbon-cutting ceremony
11/12/2007
32.25 Kb
Congressman Rogers speaking at the ribbon-cutting ceremony
11/12/2007
34.12 Kb
Colonel Dana Hurst speaks at the ribbon-cutting ceremony
11/12/2007
36.43 Kb
City of Martin City Council at the ceremony
11/12/2007
30.33 Kb
Allen Central HS Junior ROTC posts colors
Welcome to Martin sign
View of the new retaining wall and security fence
View of new street and curbing at the circle
View of new site from I-80 bridge
Allen Central HS Junior ROTC posts colors
11/12/2007
28.57 Kb
Welcome to Martin sign
10/25/2007
36.01 Kb
View of the new retaining wall and security fence
10/25/2007
22.57 Kb
View of new street and curbing at the circle
10/25/2007
28.92 Kb
View of new site from I-80 bridge
10/25/2007
26.45 Kb
Finish concrete work on the upper retaining wall
Aerial view of the Phase 1 site
Aerial view of access road and new street
Paving and curbs on access road to Phase 1 site
New curbs and gutter on access road into Phase 1 site
Finish concrete work on the upper retaining wall
10/25/2007
34.06 Kb
Aerial view of the Phase 1 site
10/25/2007
39.94 Kb
Aerial view of access road and new street
10/25/2007
40.51 Kb
Paving and curbs on access road to Phase 1 site
10/8/2007
28.29 Kb
New curbs and gutter on access road into Phase 1 site
10/8/2007
28.15 Kb
Laying binder course at Phase 1 site
Base asphalt course on Route 1428
Trucks with asphalt at Phase 1 site
Removal of Route 1428 median
Pumper truck providing water spray during demolition
Laying binder course at Phase 1 site
10/8/2007
34.88 Kb
Base asphalt course on Route 1428
10/8/2007
28.56 Kb
Trucks with asphalt at Phase 1 site
9/26/2007
23.71 Kb
Removal of Route 1428 median
9/26/2007
27.14 Kb
Pumper truck providing water spray during demolition
9/26/2007
25.41 Kb
Preparing equipment for Cash Saver demolition
Paving new circle at Phase 1 site
New pavement at intersection at Phase 1 site
Laying asphalt on new street and circle
Grading for new street in Phase 1 site
Preparing equipment for Cash Saver demolition
9/26/2007
30.57 Kb
Paving new circle at Phase 1 site
9/26/2007
25.07 Kb
New pavement at intersection at Phase 1 site
9/26/2007
24.46 Kb
Laying asphalt on new street and circle
9/26/2007
22.99 Kb
Grading for new street in Phase 1 site
9/26/2007
33.41 Kb
Extended boom excavator in demolition
Excavator removing median in Route 1428
Excavator preparing to demolish Cash Saver building
Excavator demolishing Cash Saver building
Cash Saver demolition with water spray for dust control
Extended boom excavator in demolition
9/26/2007
22.1 Kb
Excavator removing median in Route 1428
9/26/2007
37.44 Kb
Excavator preparing to demolish Cash Saver building
9/26/2007
25.88 Kb
Excavator demolishing Cash Saver building
9/26/2007
21.44 Kb
Cash Saver demolition with water spray for dust control
9/26/2007
20.33 Kb
Cash Saver building prior to demolition
Cash Saver building being demolished
asphalt -1 9-25-07 #3
asphalt -2 9-25-07 #2
Security fence and walls at entrance
Cash Saver building prior to demolition
9/26/2007
25.1 Kb
Cash Saver building being demolished
9/26/2007
24.11 Kb
asphalt -1 9-25-07 #3
9/26/2007
21.16 Kb
asphalt -2 9-25-07 #2
9/26/2007
17.97 Kb
Security fence and walls at entrance
9/10/2007
19.54 Kb
Security fence and access road alignment
Phase 1 Site entrance from bridge
Lower wall, parapet wall, and moment slab
Down hill wall and moment slab 8-28-07
Access road grade and uper retaining wall
Security fence and access road alignment
9/10/2007
18.73 Kb
Phase 1 Site entrance from bridge
9/10/2007
23.28 Kb
Lower wall, parapet wall, and moment slab
9/10/2007
23.51 Kb
Down hill wall and moment slab 8-28-07
9/10/2007
29.77 Kb
Access road grade and uper retaining wall
9/10/2007
32.16 Kb
Access road and security fence on upper wall
Walkway and moment slab
View of upper and lower walls
Preparing to Pour on Lower Wall
Placing concrete in texture forms on lower wall
Access road and security fence on upper wall
9/10/2007
18.99 Kb
Walkway and moment slab
7/25/2007
32.39 Kb
View of upper and lower walls
7/25/2007
39.72 Kb
Preparing to Pour on Lower Wall
7/25/2007
39.44 Kb
Placing concrete in texture forms on lower wall
7/25/2007
37.24 Kb
Parapet on Upper Retaining Wall
Lower wall with drainage fabric
Lower wall construction
Lower Retaining Wall Texture
Lower Retaining Wall Construction
Parapet on Upper Retaining Wall
7/25/2007
23.66 Kb
Lower wall with drainage fabric
7/25/2007
44.66 Kb
Lower wall construction
7/25/2007
30.25 Kb
Lower Retaining Wall Texture
7/25/2007
41.73 Kb
Lower Retaining Wall Construction
7/25/2007
32.16 Kb
Installing water line 6-1-07
Installing fire hydrant 6-1-07
Forming on Lower Retaining Wall
End of Upper Retaining Wall
Concrete gutter with catch basins
Installing water line 6-1-07
7/25/2007
30.21 Kb
Installing fire hydrant 6-1-07
7/25/2007
32.69 Kb
Forming on Lower Retaining Wall
7/25/2007
43.76 Kb
End of Upper Retaining Wall
7/25/2007
52.4 Kb
Concrete gutter with catch basins
7/25/2007
45.7 Kb
Aerial View of Phase 1 Site June 07
Sediment pond at Mayo Hollow
Scaffolding on completed wall surface
Moment slab and walkwayon upper wall
Forming textured concrete pours on upper wall
Aerial View of Phase 1 Site June 07
7/25/2007
45.78 Kb
Sediment pond at Mayo Hollow
5/25/2007
31.87 Kb
Scaffolding on completed wall surface
5/25/2007
36.16 Kb
Moment slab and walkwayon upper wall
5/25/2007
37.68 Kb
Forming textured concrete pours on upper wall
5/25/2007
40.42 Kb
Forming for textured concrete wall panel on lower wall
Form liners for concrete texturing
Excavation on the secondary access road
Excavation for storm sewers
Completion of concrete pours on upper wall surface
Forming for textured concrete wall panel on lower wall
5/25/2007
42.14 Kb
Form liners for concrete texturing
5/25/2007
33.39 Kb
Excavation on the secondary access road
5/25/2007
39.3 Kb
Excavation for storm sewers
5/25/2007
27.62 Kb
Completion of concrete pours on upper wall surface
5/25/2007
20.92 Kb
Completed section of concrete drainage ditch
Attaching scaffolding to wall surface
Storm sewer excavations
Placing concrete for new ditch
Installing storm sewers in Phase I site
Completed section of concrete drainage ditch
5/25/2007
38.75 Kb
Attaching scaffolding to wall surface
5/25/2007
40.04 Kb
Storm sewer excavations
5/25/2007
36.28 Kb
Placing concrete for new ditch
5/25/2007
42.92 Kb
Installing storm sewers in Phase I site
5/25/2007
41.3 Kb
Finishing concrete in drainage ditch
Excavating for sewer line
Excavating for new concrete gutter
View of Upper Wall from bridge 4-5-07
View of access road and upper wall 4-5-07
Finishing concrete in drainage ditch
5/25/2007
41.59 Kb
Excavating for sewer line
5/25/2007
31.27 Kb
Excavating for new concrete gutter
5/25/2007
33.58 Kb
View of Upper Wall from bridge 4-5-07
4/5/2007
25.49 Kb
View of access road and upper wall 4-5-07
4/5/2007
31.36 Kb
Placing concrete for paved gutter 4-5-07
Placing concrete for upper wall 3-30-07
Power shovel excavating for secondary access road 3-13-07
View of Upper Wall textured surface 3-13-07
View of snowy Phase I site
Placing concrete for paved gutter 4-5-07
4/5/2007
31.48 Kb
Placing concrete for upper wall 3-30-07
3/30/2007
42.73 Kb
Power shovel excavating for secondary access road 3-13-07
3/13/2007
30.39 Kb
View of Upper Wall textured surface 3-13-07
3/13/2007
36.59 Kb
View of snowy Phase I site
2/11/2007
48.22 Kb
Textured retaining wall
Phase I site with snow cover
Construction of textured panels continues
Back filling upper retaining wall
All Anchors installed in lower wall
Textured retaining wall
2/11/2007
39.81 Kb
Phase I site with snow cover
2/11/2007
46.4 Kb
Construction of textured panels continues
2/11/2007
44.04 Kb
Back filling upper retaining wall
2/11/2007
47.55 Kb
All Anchors installed in lower wall
2/11/2007
40.02 Kb
Textured concrete wall panels
Preparing to place concrete 5th panel
Placing concrete for textured panels
Textured concrete panels on upper wall
Performing stress test on lower wall anchors
Textured concrete wall panels
1/14/2007
33.66 Kb
Preparing to place concrete 5th panel
1/9/2007
38.24 Kb
Placing concrete for textured panels
1/9/2007
33.22 Kb
Textured concrete panels on upper wall
1/11/2007
36.65 Kb
Performing stress test on lower wall anchors
1/11/2007
31.8 Kb
Drilling anchor holes in upper wall surface
Drilling anchor hole on upper wall surface
Installing rock anchor tendons in drill holes
Hydraulic jack system stressing anchor tendons
Testing rock anchors on upper wall
Drilling anchor holes in upper wall surface
12/11/2006
42.3 Kb
Drilling anchor hole on upper wall surface
12/11/2006
37.35 Kb
Installing rock anchor tendons in drill holes
12/11/2006
46.11 Kb
Hydraulic jack system stressing anchor tendons
12/11/2006
33.36 Kb
Testing rock anchors on upper wall
12/11/2006
34.61 Kb
First row of anchors installed on upper wall
Excavating material away from upper wall
Phase I access road located between upper and lower walls
Installing first row of rock anchors in lower wall
Alignment of retaining walls in aerial view
First row of anchors installed on upper wall
12/11/2006
40.91 Kb
Excavating material away from upper wall
12/11/2006
47.15 Kb
Phase I access road located between upper and lower walls
12/11/2006
44.81 Kb
Installing first row of rock anchors in lower wall
12/11/2006
39.71 Kb
Alignment of retaining walls in aerial view
12/11/2006
47.79 Kb
Test panel form with textured liner
Test panel with forms stripped away
Test panel edge treatment
Completed test panel
Placing reinforcing steel bars prior to concrete pour
Test panel form with textured liner
12/11/2006
40.45 Kb
Test panel with forms stripped away
12/11/2006
32.98 Kb
Test panel edge treatment
12/11/2006
30 Kb
Completed test panel
12/11/2006
30.6 Kb
Placing reinforcing steel bars prior to concrete pour
12/11/2006
37.79 Kb
Textured form liner applied to formwork for first panel
Concrete placement for first textured wall panel
Stripping formwork off of first textured panel
First textured panel poured in place
First textured wall panel as seen from Route 1428
Textured form liner applied to formwork for first panel
12/11/2006
36.13 Kb
Concrete placement for first textured wall panel
12/11/2006
36.37 Kb
Stripping formwork off of first textured panel
12/11/2006
32.56 Kb
First textured panel poured in place
12/11/2006
38.73 Kb
First textured wall panel as seen from Route 1428
12/11/2006
29.41 Kb
Initiating demolition of the BP station
BP station demolition complete
Placing new fill material at the BP station site
Previous BP station ste seeded and mulched
Test hole #7
Initiating demolition of the BP station
12/11/2006
25.51 Kb
BP station demolition complete
12/11/2006
31.26 Kb
Placing new fill material at the BP station site
12/11/2006
31.31 Kb
Previous BP station ste seeded and mulched
12/11/2006
21.12 Kb
Test hole #7
8/11/2006
34.61 Kb
Installing anchor at test hole #21
Hole #21 drilling
H pile upper and lower retaining walls
Drilling at test hole #21.JPG
Upper wall alignment with wood lagging being installed
Installing anchor at test hole #21
8/11/2006
39.44 Kb
Hole #21 drilling
8/11/2006
34.45 Kb
H pile upper and lower retaining walls
8/11/2006
29.85 Kb
Drilling at test hole #21.JPG
8/11/2006
39.94 Kb
Upper wall alignment with wood lagging being installed
8/7/2006
35.85 Kb
Alignment of upper wall H-piling in place
Phase I entrance onto Route 1428 with H-piling alignments
Alignment of access road flanked by installed H-piling
Aerial view of Phase I site with H-piling
Wood lagging for retaining walls
Alignment of upper wall H-piling in place
8/7/2006
39.35 Kb
Phase I entrance onto Route 1428 with H-piling alignments
8/7/2006
37.09 Kb
Alignment of access road flanked by installed H-piling
8/7/2006
36.79 Kb
Aerial view of Phase I site with H-piling
8/7/2006
39.88 Kb
Wood lagging for retaining walls
7/14/2006
32.9 Kb
Welder cutting H-piling to correct length
Steel rock-anchor rods for retaining walls
Re-setting sized H-piling for upper retaining wall
Precise measurement of H-piling with stadia rod
Placing concrete at H-piling
Welder cutting H-piling to correct length
7/14/2006
40.91 Kb
Steel rock-anchor rods for retaining walls
7/14/2006
41.04 Kb
Re-setting sized H-piling for upper retaining wall
7/14/2006
37.91 Kb
Precise measurement of H-piling with stadia rod
7/14/2006
37.89 Kb
Placing concrete at H-piling
7/14/2006
41.69 Kb
Performing concrete slump test
Lower retaining wall H-piling alignment
H-piling for the retaining walls
Drilling holes for H-piling on upper wall
Crane with H-piling on upper wall
Performing concrete slump test
7/14/2006
32.27 Kb
Lower retaining wall H-piling alignment
7/14/2006
26.41 Kb
H-piling for the retaining walls
7/14/2006
31.67 Kb
Drilling holes for H-piling on upper wall
7/14/2006
44.4 Kb
Crane with H-piling on upper wall
7/14/2006
25.4 Kb
Corrosion protection liners for rock-anchor rods
Alignment of upper wall H-piling
Welders preparing H-piling for retaining wall
Welders at H-piling for retaining walls
Preparations underway for piling placement at Phase I site
Corrosion protection liners for rock-anchor rods
7/14/2006
39.3 Kb
Alignment of upper wall H-piling
7/14/2006
30.66 Kb
Welders preparing H-piling for retaining wall
6/21/2006
32.68 Kb
Welders at H-piling for retaining walls
6/21/2006
35.65 Kb
Preparations underway for piling placement at Phase I site
6/21/2006
38.69 Kb
Contractor's equipment preparing to drive piling along wall alignment
Display of project alternatives
Martin PDT member talking with landowner
Martin PDT member listening to landowners
May 2006 Workshop meeting
Contractor's equipment preparing to drive piling along wall alignment
6/21/2006
35.19 Kb
Display of project alternatives
6/2/2006
24 Kb
Martin PDT member talking with landowner
6/2/2006
26.42 Kb
Martin PDT member listening to landowners
6/2/2006
23.79 Kb
May 2006 Workshop meeting
6/2/2006
26.7 Kb
Phase I site - April 2006
Manhole installation at Phase I Site
Aerial View of Phase I site - April 2006
Final grading of CAP building site
CAP building site graded and seeded
Phase I site - April 2006
5/18/2006
29.02 Kb
Manhole installation at Phase I Site
5/18/2006
39.29 Kb
Aerial View of Phase I site - April 2006
5/18/2006
45.93 Kb
Final grading of CAP building site
5/11/2006
34.14 Kb
CAP building site graded and seeded
5/11/2006
28.87 Kb
CAP building completely down
R26N7 Mayo Hollow
North-South cut face Redevelopment Site
Nearing completion of CAP building demolition
May 2006 demolition of CAP building
CAP building completely down
5/11/2006
28.98 Kb
R26N7 Mayo Hollow
5/5/2006
34.71 Kb
North-South cut face Redevelopment Site
5/5/2006
34.11 Kb
Nearing completion of CAP building demolition
5/5/2006
33.15 Kb
May 2006 demolition of CAP building
5/5/2006
31.46 Kb
March 2006 Access Road
Fork-lift equipment used in demolition process
Demolition Contractor dismantling the CAP building
Utilities installation on Phase I site March 2006
Center cut with new hydroseeding (blue tint)
March 2006 Access Road
5/5/2006
39.93 Kb
Fork-lift equipment used in demolition process
5/5/2006
37.58 Kb
Demolition Contractor dismantling the CAP building
5/5/2006
30.9 Kb
Utilities installation on Phase I site March 2006
4/14/2006
47.26 Kb
Center cut with new hydroseeding (blue tint)
4/14/2006
38.67 Kb
Transition to North-South cut - utilities excavation and hydroseeding (blue)
March 2006 Phase I site entrance area
Flagging for retaining wall alignment Phase I site
View of East-West Cut, January 2006
Phase I Site with Downtown Martin in background
Transition to North-South cut - utilities excavation and hydroseeding (blue)
4/14/2006
33.78 Kb
March 2006 Phase I site entrance area
4/14/2006
29.33 Kb
Flagging for retaining wall alignment Phase I site
4/14/2006
26.54 Kb
View of East-West Cut, January 2006
2/24/2006
42.8 Kb
Phase I Site with Downtown Martin in background
2/24/2006
44.11 Kb
Phase I Redevelopment Site, January 2006
Nearing Completion of North-South Cut Excavation, January 2006
Nearing Completion of Filling at Mayo Hollow, January 2006
Mayo Hollow in January 2006
R18N13 Mayo Hollow 100 Res
Phase I Redevelopment Site, January 2006
2/24/2006
43.08 Kb
Nearing Completion of North-South Cut Excavation, January 2006
2/24/2006
53.21 Kb
Nearing Completion of Filling at Mayo Hollow, January 2006
2/24/2006
43.82 Kb
Mayo Hollow in January 2006
2/24/2006
29.49 Kb
R18N13 Mayo Hollow 100 Res
10/5/2005
37.67 Kb
R18N12 Mayo Hollow 100 Res
View of the North-South cut from the center cut
View of the North-South cut face
View of the East-West cut from the center cut
View of Martin from East-West cut
R18N12 Mayo Hollow 100 Res
10/5/2005
31.95 Kb
View of the North-South cut from the center cut
10/5/2005
32.9 Kb
View of the North-South cut face
10/5/2005
32.18 Kb
View of the East-West cut from the center cut
10/5/2005
34.29 Kb
View of Martin from East-West cut
10/5/2005
31.65 Kb
Soil covering on rock bench in center cut.
Loading material on North-South cut
Loading material at the center cut area
Center cut face
Trucks unloading at Mayo Hollow
Soil covering on rock bench in center cut.
10/5/2005
35.68 Kb
Loading material on North-South cut
10/5/2005
38.13 Kb
Loading material at the center cut area
10/5/2005
38.66 Kb
Center cut face
10/5/2005
39.19 Kb
Trucks unloading at Mayo Hollow
8/23/2005
39.3 Kb
Town of Martin and Phase I Site
Removing Coal Seam on East-West Cut
Excavator on North-South Cut
Aerial View of Phase I Site
Wall, East-West cut
Town of Martin and Phase I Site
8/23/2005
38.56 Kb
Removing Coal Seam on East-West Cut
8/23/2005
49.36 Kb
Excavator on North-South Cut
8/23/2005
42.7 Kb
Aerial View of Phase I Site
8/23/2005
38.31 Kb
Wall, East-West cut
7/27/2005
31.69 Kb
Trucks unloading at spoil site
Route 1428 washed through town
Excavation on North-South cut
Excavating coal seam on East-West cut
Phase I Redevelopment Site Excavation June 2005
Trucks unloading at spoil site
7/27/2005
30.23 Kb
Route 1428 washed through town
7/27/2005
27.58 Kb
Excavation on North-South cut
7/27/2005
27.11 Kb
Excavating coal seam on East-West cut
7/27/2005
38.24 Kb
Phase I Redevelopment Site Excavation June 2005
7/13/2005
51.46 Kb
Ongoing Excavation of the East-West Cut Slope
Downtown Martin, KY with Phase I Site in Foreground
Mayo Hollow Temporary Spoil Area
Workshop attendance by Martin business owners
Business owners in Martin attending Workshop
Ongoing Excavation of the East-West Cut Slope
7/13/2005
51.9 Kb
Downtown Martin, KY with Phase I Site in Foreground
7/13/2005
55.33 Kb
Mayo Hollow Temporary Spoil Area
7/13/2005
49.63 Kb
Workshop attendance by Martin business owners
6/24/2005
26.39 Kb
Business owners in Martin attending Workshop
6/24/2005
28.66 Kb
Woody tree species repopulating slopes
Sumac repopulating cut slopes
Rye, fescue and clover mixture germination
High stem count on seeded slopes
Methodist church demolition
Woody tree species repopulating slopes
6/23/2005
47.74 Kb
Sumac repopulating cut slopes
6/23/2005
50.72 Kb
Rye, fescue and clover mixture germination
6/23/2005
53.29 Kb
High stem count on seeded slopes
6/23/2005
60.33 Kb
Methodist church demolition
6/23/2005
33.98 Kb
Methodist Church and parsonage sites after seeding
Excavation above the first coal seam on East/West cut
Excavating loose soil on the East/West bench
Drilling a production shot on the East/West cut
Drilling blast pattern on North/South cut
Methodist Church and parsonage sites after seeding
6/23/2005
26.58 Kb
Excavation above the first coal seam on East/West cut
6/23/2005
44.81 Kb
Excavating loose soil on the East/West bench
6/23/2005
36.55 Kb
Drilling a production shot on the East/West cut
6/23/2005
39.64 Kb
Drilling blast pattern on North/South cut
6/23/2005
33.34 Kb
Dozer grading steep slope on East/West cut.
Blasting crew inserting explosives for production shot
Methodist parsonage demolition
Jan's Flowershop demolition complete
Excavating material above first coal seam East/West cut
Dozer grading steep slope on East/West cut.
6/23/2005
41.4 Kb
Blasting crew inserting explosives for production shot
6/23/2005
36.04 Kb
Methodist parsonage demolition
6/22/2005
35.89 Kb
Jan's Flowershop demolition complete
6/22/2005
41.94 Kb
Excavating material above first coal seam East/West cut
6/22/2005
41.91 Kb
Endloader waiting for next truck
Drilling angled pre-split holes on North/South face
Christian Appalachian Project structure purchased for project
Topsoil on benches at North/South cut
Seed mixture growing on East/West cut
Endloader waiting for next truck
6/22/2005
40.39 Kb
Drilling angled pre-split holes on North/South face
6/22/2005
37.83 Kb
Christian Appalachian Project structure purchased for project
6/22/2005
32.22 Kb
Topsoil on benches at North/South cut
6/20/2005
45 Kb
Seed mixture growing on East/West cut
6/20/2005
37.48 Kb
Rock faces on North/South cut
Rock face curve on North/South cut
Placing spoil material at Mayo Hollow
Excavation on East/West cut
Endloader working on East/West cut
Rock faces on North/South cut
6/20/2005
33.93 Kb
Rock face curve on North/South cut
6/20/2005
44.42 Kb
Placing spoil material at Mayo Hollow
6/20/2005
32.05 Kb
Excavation on East/West cut
6/20/2005
45.4 Kb
Endloader working on East/West cut
6/20/2005
44.29 Kb
Corps employee describing rock fractures to consultants
Working on North/South cut
Trucks lining up to load at East/West cut
Shovels on North/South cut
Shot 109, East/West cut
Corps employee describing rock fractures to consultants
6/20/2005
41.04 Kb
Working on North/South cut
6/13/2005
33.68 Kb
Trucks lining up to load at East/West cut
6/13/2005
40.04 Kb
Shovels on North/South cut
6/13/2005
41.59 Kb
Shot 109, East/West cut
6/13/2005
31.8 Kb
Shot 81 and 82, East/West cut
Powershovel working on North/South cut
North/South cut
Measuring coal seam on North/South cut
Hydroseeding, East/West cut
Shot 81 and 82, East/West cut
6/13/2005
22.87 Kb
Powershovel working on North/South cut
6/13/2005
29.59 Kb
North/South cut
6/13/2005
34.18 Kb
Measuring coal seam on North/South cut
6/13/2005
48.25 Kb
Hydroseeding, East/West cut
6/13/2005
34.08 Kb
Hydroseeding at drainage swale, East/West cut
First grass on East/West cut area
East/West cut faces
East/West cut during shot
Drilling the point on East/West cut area
Hydroseeding at drainage swale, East/West cut
6/13/2005
31.42 Kb
First grass on East/West cut area
6/13/2005
54.08 Kb
East/West cut faces
6/13/2005
35.69 Kb
East/West cut during shot
6/13/2005
32.25 Kb
Drilling the point on East/West cut area
6/13/2005
38.62 Kb
Drill rigs on East/West cut area
Detonation of shot on East/West Cut
Cut East/West Loading
Sandstone rock face and topsoil bench on East/West cut
Downslope on East/West cut
Drill rigs on East/West cut area
6/13/2005
45.93 Kb
Detonation of shot on East/West Cut
6/13/2005
31.64 Kb
Cut East/West Loading
6/13/2005
33.17 Kb
Sandstone rock face and topsoil bench on East/West cut
3/15/2005
43 Kb
Downslope on East/West cut
3/15/2005
51.31 Kb
Drilling and excavating on North/South cut
Endloader filling dump on East/West cut
View north from East/West cut
Endloader working debris on East/West cut
Sandstone rock face on North/South cut
Drilling and excavating on North/South cut
3/15/2005
52.89 Kb
Endloader filling dump on East/West cut
3/15/2005
62.84 Kb
View north from East/West cut
3/15/2005
44.96 Kb
Endloader working debris on East/West cut
3/15/2005
37.69 Kb
Sandstone rock face on North/South cut
3/15/2005
57.41 Kb
Powershovel on North/South cut
Excavation of East/West cut slope
Powershovel and ramhoe on North/South cut
Drilling blast pattern on North/South cut
Preparing seismic instruments
Powershovel on North/South cut
3/15/2005
46.84 Kb
Excavation of East/West cut slope
3/15/2005
62.46 Kb
Powershovel and ramhoe on North/South cut
3/15/2005
56.2 Kb
Drilling blast pattern on North/South cut
3/15/2005
52.56 Kb
Preparing seismic instruments
3/15/2005
63.51 Kb
Hauling spoil material into Mayo Hollow
Retention Pond at Mayo Hollow
East/West Cut
North/South cut View
Looking from North/South cut to East/West cut
Hauling spoil material into Mayo Hollow
3/15/2005
59.58 Kb
Retention Pond at Mayo Hollow
3/15/2005
52.49 Kb
East/West Cut
3/15/2005
28.74 Kb
North/South cut View
3/9/2005
37.95 Kb
Looking from North/South cut to East/West cut
3/3/2005
52.99 Kb
Work on East/West cut
Truck backing up on North/South cut
North/South Layout
Redevelopment Site Aerial
Redevelopment Site Aerial
Work on East/West cut
2/25/2005
44.11 Kb
Truck backing up on North/South cut
2/24/2005
34.58 Kb
North/South Layout
2/9/2005
45 Kb
Redevelopment Site Aerial
2/11/2005
43.06 Kb
Redevelopment Site Aerial
2/11/2005
44.02 Kb
Redevelopment Site
Pre-split
North/South cut
Load for shot on East/West Side
Hoe loading truck on North/South cut
Redevelopment Site
2/11/2005
55.24 Kb
Pre-split
2/2/2005
25.43 Kb
North/South cut
2/9/2005
37.09 Kb
Load for shot on East/West Side
2/10/2005
45.65 Kb
Hoe loading truck on North/South cut
2/24/2005
34.35 Kb
E-W haul road looking from North/South Cut
Drill Rigs on East/West Cut
Drill Rigs on North/South Cut
Phase I: Drilling Hole with Two Drills
Phase I: Excavator on N-S Cut
E-W haul road looking from North/South Cut
2/23/2005
39.51 Kb
Drill Rigs on East/West Cut
2/11/2005
38.73 Kb
Drill Rigs on North/South Cut
2/23/2005
42.73 Kb
Phase I: Drilling Hole with Two Drills
2/1/2005
41.88 Kb
Phase I: Excavator on N-S Cut
2/1/2005
42.84 Kb
Phase I: Load Truck at N-S Redevelopment
Phase I: Hoe Ramming Rock
Phase I
Phase I
Phase I: Drilling at Hole
Phase I: Load Truck at N-S Redevelopment
1/31/2005
54.58 Kb
Phase I: Hoe Ramming Rock
2/1/2005
42.53 Kb
Phase I
1/28/2005
28.92 Kb
Phase I
1/28/2005
31.87 Kb
Phase I: Drilling at Hole
1/28/2005
34.12 Kb
Phase I: Trucks and Loader
Phase I: Mayo Hollow Pond
Phase I: Loading Materials
Phase I: Haul Road
Phase I: Drill Rig
Phase I: Trucks and Loader
1/27/2005
61.98 Kb
Phase I: Mayo Hollow Pond
1/25/2005
38.59 Kb
Phase I: Loading Materials
1/25/2005
47.86 Kb
Phase I: Haul Road
1/25/2005
34.69 Kb
Phase I: Drill Rig
2/1/2005
37.43 Kb
Phase I: Haul Road at Mayo Hollow
Phase I: Removing Rock at Phase I Site Entrance
Phase I: Trucks Unloading at Mayo Hollow Spoil Site
Phase I: Dozer Cutting Benches at Mayo Hollow
Phase I: Water Level at Mayo Hollow
Phase I: Haul Road at Mayo Hollow
1/31/2005
49.92 Kb
Phase I: Removing Rock at Phase I Site Entrance
1/17/2005
34.78 Kb
Phase I: Trucks Unloading at Mayo Hollow Spoil Site
1/17/2005
32.59 Kb
Phase I: Dozer Cutting Benches at Mayo Hollow
1/14/2005
51 Kb
Phase I: Water Level at Mayo Hollow
1/14/2005
25.09 Kb
Phase I: Pond Area at Mayo Hollow
Phase I: Riser at Mayo Hollow
Phase I: Pouring Concrete for Riser Pip Footer at Mayo Hollow
Phase I:  Riser Pipe Before Pouring Concrete at Mayo Hollow
Phase I: Discharge Pipe at Mayo Hollow
Phase I: Pond Area at Mayo Hollow
1/13/2005
34.71 Kb
Phase I: Riser at Mayo Hollow
1/11/2005
47.83 Kb
Phase I: Pouring Concrete for Riser Pip Footer at Mayo Hollow
1/10/2005
54.16 Kb
Phase I: Riser Pipe Before Pouring Concrete at Mayo Hollow
1/10/2005
35.88 Kb
Phase I: Discharge Pipe at Mayo Hollow
1/14/2005
43.26 Kb
Phase I: View of Redevelopment Excavation Site
Phase I: View of Redevelopment Cut
Phase I: Redevelopment Cut Site
Phase I:  Aerial view of downtown Martin and Phase I site.
Phase I:  Aerial view of downtown Martin and Phase I site.
Phase I: View of Redevelopment Excavation Site
1/7/2005
33 Kb
Phase I: View of Redevelopment Cut
1/7/2005
37.84 Kb
Phase I: Redevelopment Cut Site
1/7/2005
43.65 Kb
Phase I: Aerial view of downtown Martin and Phase I site.
12/15/2004
47.83 Kb
Phase I: Aerial view of downtown Martin and Phase I site.
12/15/2004
56.81 Kb
Phase I:  Aerial view of Phase I site.
Phase I:  Aerial view of Mayo Hollow.
Phase I:  Upstream side of the sediment retention structure at May Hollow
Phase I: Riser Pipe at Mayo Hollow
Phase I: First Blasts
Phase I: Aerial view of Phase I site.
12/15/2004
58.33 Kb
Phase I: Aerial view of Mayo Hollow.
12/15/2004
56.43 Kb
Phase I: Upstream side of the sediment retention structure at May Hollow
12/15/2004
46.48 Kb
Phase I: Riser Pipe at Mayo Hollow
12/15/2004
45.92 Kb
Phase I: First Blasts
12/15/2004
34.36 Kb
Phase I: Downtown Martin
Phase I:  1428 & 80 Connector
Phase I: Contractor's Office
Phase I: Contractor's December 7, 2004 Public Meeting on Blasting
Phase I: Temporary Parking Lot
Phase I: Downtown Martin
12/8/2004
49.62 Kb
Phase I: 1428 & 80 Connector
12/8/2004
53.86 Kb
Phase I: Contractor's Office
12/7/2004
41.84 Kb
Phase I: Contractor's December 7, 2004 Public Meeting on Blasting
12/7/2004
29.26 Kb
Phase I: Temporary Parking Lot
11/29/2004
37.07 Kb
spillway 11-17-04
starting to place riprap at spillway 11-17-04
upstream area of pond 11-16-04
pond area 11-10-04
concrete at 36 inch pipe 11-11-04
spillway 11-17-04
11/23/2004
42.91 Kb
starting to place riprap at spillway 11-17-04
11/23/2004
29.7 Kb
upstream area of pond 11-16-04
11/18/2004
31.71 Kb
pond area 11-10-04
11/17/2004
37.12 Kb
concrete at 36 inch pipe 11-11-04
11/17/2004
36.15 Kb
Placing rebar at 36 inch pipe 11-10-04
compacting clay fill on dike 11-16-04
view of dam and pond site mayo 10-07-04
Turn in to Mayo Spoil siite 10-06-04
Temp Road 10-25-04
Placing rebar at 36 inch pipe 11-10-04
11/17/2004
38.01 Kb
compacting clay fill on dike 11-16-04
11/17/2004
28.33 Kb
view of dam and pond site mayo 10-07-04
11/10/2004
42.33 Kb
Turn in to Mayo Spoil siite 10-06-04
11/10/2004
38.46 Kb
Temp Road 10-25-04
11/10/2004
32.25 Kb
loading fill materail 10-26-04
geo grid 10--25-04
first lift dike area 10-26-04
Dam area after rain 10-26-04
Construction - HDPE 11-05-04
loading fill materail 10-26-04
11/10/2004
45.36 Kb
geo grid 10--25-04
11/10/2004
42.46 Kb
first lift dike area 10-26-04
11/10/2004
43.79 Kb
Dam area after rain 10-26-04
11/10/2004
29.49 Kb
Construction - HDPE 11-05-04
11/10/2004
44.62 Kb
Construction - excavating for 36 inch pipe 11-05-2004
aggregate for 36 inch pipe mayo 11-05-04
aggregate bedding 11-5-04
Valley View - Williamson, WV
Valley View - Williamson, WV
Construction - excavating for 36 inch pipe 11-05-2004
11/10/2004
34.4 Kb
aggregate for 36 inch pipe mayo 11-05-04
11/10/2004
36.19 Kb
aggregate bedding 11-5-04
11/10/2004
45.82 Kb
Valley View - Williamson, WV
8/18/2004
52.49 Kb
Valley View - Williamson, WV
8/13/2004
56.33 Kb
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
New temporary fire station and Corps field office (at far end of the building) located on 1428 between downtown and Mayo Hollow.
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
8/9/2004
48.02 Kb
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
8/9/2004
46.04 Kb
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
8/9/2004
36.12 Kb
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site.
8/9/2004
47.19 Kb
New temporary fire station and Corps field office (at far end of the building) located on 1428 between downtown and Mayo Hollow.
8/9/2004
35.21 Kb
Phase I site (longshot)
Phase I site looking down 1428 through the heart of Martin Downtown.
Phase I site looking down 1428 through the heart of Martin Downtown (close up).
Phase I Site Clearing
Phase I Site Clearing
Phase I site (longshot)
8/9/2004
37.33 Kb
Phase I site looking down 1428 through the heart of Martin Downtown.
8/9/2004
56.69 Kb
Phase I site looking down 1428 through the heart of Martin Downtown (close up).
8/9/2004
41.17 Kb
Phase I Site Clearing
8/9/2004
59.79 Kb
Phase I Site Clearing
8/9/2004
59.79 Kb
Phase I Site Clearing
Phase I Site Clearing
Phase I Site Clearing
Phase I Site Clearing
Phase I Site Clearing
Phase I Site Clearing
8/9/2004
74.58 Kb
Phase I Site Clearing
8/9/2004
63.83 Kb
Phase I Site Clearing
8/9/2004
66.31 Kb
Phase I Site Clearing
8/9/2004
58.29 Kb
Phase I Site Clearing
8/9/2004
50.6 Kb
Groundbreaking festivities by the Honorable Guests.
Judge Executive Paul Hunt Thompson
Hon. John P. Woodley
Dr. Varia and Mayor Robinson
Congressman Hal Rogers
Groundbreaking festivities by the Honorable Guests.
8/9/2004
49.54 Kb
Judge Executive Paul Hunt Thompson
8/9/2004
37.33 Kb
Hon. John P. Woodley
8/9/2004
39.91 Kb
Dr. Varia and Mayor Robinson
8/9/2004
47.1 Kb
Congressman Hal Rogers
8/9/2004
44.96 Kb
Colonel William Bulen
       
Colonel William Bulen
7/10/2004
41.28 Kb