|
|
|
|
|
Phase 1 Site entrance with landscape materials 7/11/2008 32.55 Kb
|
Mayo Hollow sediment pond 7/11/2008 39.18 Kb
|
Landscape materials in new grass cover 7/11/2008 29.01 Kb
|
Site entrance landscape materials 7/11/2008 31.94 Kb
|
Steep slope Hawthorn tree planting 7/11/2008 35.06 Kb
|
|
|
|
|
|
Safety screens on culvert entrances 7/11/2008 39.35 Kb
|
Vegetation on second bench 7/11/2008 38.01 Kb
|
Sumac species in seeding mixture on benches 7/11/2008 40.43 Kb
|
Concrete gutter capturing debris 7/11/2008 36.46 Kb
|
Phase 1 grass cover 7/11/2008 27.89 Kb
|
|
|
|
|
|
Vegetative cover on benches 7/11/2008 43.48 Kb
|
Circle area grass cover 7/11/2008 29.56 Kb
|
Vegetative cover on lower bench 7/11/2008 37.57 Kb
|
Grass cover on Phase 1 site 7/11/2008 23.79 Kb
|
Entrance sidewalk with new grass cover 7/11/2008 27.93 Kb
|
|
|
|
|
|
Plantings and entrance sign at Phase 1 site 3/6/2008 39.01 Kb
|
Plantings along sidewalk into Phase 1 site 3/6/2008 36.99 Kb
|
Phase 1 site access road entrance 3/6/2008 25.26 Kb
|
Landscaping at site entrance 3/6/2008 44.83 Kb
|
Landscape plantings near Phase 1 site entrance 3/6/2008 38.48 Kb
|
|
|
|
|
|
Phase I site from Route 1428 1/24/2008 25.57 Kb
|
Phase 1 site entrance 1/24/2008 22.3 Kb
|
Portion of the crowd at the ceremony 11/12/2007 37.67 Kb
|
Ms. Jerica Blair sings the national anthem 11/12/2007 34.48 Kb
|
Mayor Robinson addresses the crowd at the ceremony 11/12/2007 31.26 Kb
|
|
|
|
|
|
Doc Marshall Judge Executive speaks at the ceremony 11/12/2007 33.56 Kb
|
Dignitaries prepare for the ribbon-cutting ceremony 11/12/2007 32.25 Kb
|
Congressman Rogers speaking at the ribbon-cutting ceremony 11/12/2007 34.12 Kb
|
Colonel Dana Hurst speaks at the ribbon-cutting ceremony 11/12/2007 36.43 Kb
|
City of Martin City Council at the ceremony 11/12/2007 30.33 Kb
|
|
|
|
|
|
Allen Central HS Junior ROTC posts colors 11/12/2007 28.57 Kb
|
Welcome to Martin sign 10/25/2007 36.01 Kb
|
View of the new retaining wall and security fence 10/25/2007 22.57 Kb
|
View of new street and curbing at the circle 10/25/2007 28.92 Kb
|
View of new site from I-80 bridge 10/25/2007 26.45 Kb
|
|
|
|
|
|
Finish concrete work on the upper retaining wall 10/25/2007 34.06 Kb
|
Aerial view of the Phase 1 site 10/25/2007 39.94 Kb
|
Aerial view of access road and new street 10/25/2007 40.51 Kb
|
Paving and curbs on access road to Phase 1 site 10/8/2007 28.29 Kb
|
New curbs and gutter on access road into Phase 1 site 10/8/2007 28.15 Kb
|
|
|
|
|
|
Laying binder course at Phase 1 site 10/8/2007 34.88 Kb
|
Base asphalt course on Route 1428 10/8/2007 28.56 Kb
|
Trucks with asphalt at Phase 1 site 9/26/2007 23.71 Kb
|
Removal of Route 1428 median 9/26/2007 27.14 Kb
|
Pumper truck providing water spray during demolition 9/26/2007 25.41 Kb
|
|
|
|
|
|
Preparing equipment for Cash Saver demolition 9/26/2007 30.57 Kb
|
Paving new circle at Phase 1 site 9/26/2007 25.07 Kb
|
New pavement at intersection at Phase 1 site 9/26/2007 24.46 Kb
|
Laying asphalt on new street and circle 9/26/2007 22.99 Kb
|
Grading for new street in Phase 1 site 9/26/2007 33.41 Kb
|
|
|
|
|
|
Extended boom excavator in demolition 9/26/2007 22.1 Kb
|
Excavator removing median in Route 1428 9/26/2007 37.44 Kb
|
Excavator preparing to demolish Cash Saver building 9/26/2007 25.88 Kb
|
Excavator demolishing Cash Saver building 9/26/2007 21.44 Kb
|
Cash Saver demolition with water spray for dust control 9/26/2007 20.33 Kb
|
|
|
|
|
|
Cash Saver building prior to demolition 9/26/2007 25.1 Kb
|
Cash Saver building being demolished 9/26/2007 24.11 Kb
|
asphalt -1 9-25-07 #3 9/26/2007 21.16 Kb
|
asphalt -2 9-25-07 #2 9/26/2007 17.97 Kb
|
Security fence and walls at entrance 9/10/2007 19.54 Kb
|
|
|
|
|
|
Security fence and access road alignment 9/10/2007 18.73 Kb
|
Phase 1 Site entrance from bridge 9/10/2007 23.28 Kb
|
Lower wall, parapet wall, and moment slab 9/10/2007 23.51 Kb
|
Down hill wall and moment slab 8-28-07 9/10/2007 29.77 Kb
|
Access road grade and uper retaining wall 9/10/2007 32.16 Kb
|
|
|
|
|
|
Access road and security fence on upper wall 9/10/2007 18.99 Kb
|
Walkway and moment slab 7/25/2007 32.39 Kb
|
View of upper and lower walls 7/25/2007 39.72 Kb
|
Preparing to Pour on Lower Wall 7/25/2007 39.44 Kb
|
Placing concrete in texture forms on lower wall 7/25/2007 37.24 Kb
|
|
|
|
|
|
Parapet on Upper Retaining Wall 7/25/2007 23.66 Kb
|
Lower wall with drainage fabric 7/25/2007 44.66 Kb
|
Lower wall construction 7/25/2007 30.25 Kb
|
Lower Retaining Wall Texture 7/25/2007 41.73 Kb
|
Lower Retaining Wall Construction 7/25/2007 32.16 Kb
|
|
|
|
|
|
Installing water line 6-1-07 7/25/2007 30.21 Kb
|
Installing fire hydrant 6-1-07 7/25/2007 32.69 Kb
|
Forming on Lower Retaining Wall 7/25/2007 43.76 Kb
|
End of Upper Retaining Wall 7/25/2007 52.4 Kb
|
Concrete gutter with catch basins 7/25/2007 45.7 Kb
|
|
|
|
|
|
Aerial View of Phase 1 Site June 07 7/25/2007 45.78 Kb
|
Sediment pond at Mayo Hollow 5/25/2007 31.87 Kb
|
Scaffolding on completed wall surface 5/25/2007 36.16 Kb
|
Moment slab and walkwayon upper wall 5/25/2007 37.68 Kb
|
Forming textured concrete pours on upper wall 5/25/2007 40.42 Kb
|
|
|
|
|
|
Forming for textured concrete wall panel on lower wall 5/25/2007 42.14 Kb
|
Form liners for concrete texturing 5/25/2007 33.39 Kb
|
Excavation on the secondary access road 5/25/2007 39.3 Kb
|
Excavation for storm sewers 5/25/2007 27.62 Kb
|
Completion of concrete pours on upper wall surface 5/25/2007 20.92 Kb
|
|
|
|
|
|
Completed section of concrete drainage ditch 5/25/2007 38.75 Kb
|
Attaching scaffolding to wall surface 5/25/2007 40.04 Kb
|
Storm sewer excavations 5/25/2007 36.28 Kb
|
Placing concrete for new ditch 5/25/2007 42.92 Kb
|
Installing storm sewers in Phase I site 5/25/2007 41.3 Kb
|
|
|
|
|
|
Finishing concrete in drainage ditch 5/25/2007 41.59 Kb
|
Excavating for sewer line 5/25/2007 31.27 Kb
|
Excavating for new concrete gutter 5/25/2007 33.58 Kb
|
View of Upper Wall from bridge 4-5-07 4/5/2007 25.49 Kb
|
View of access road and upper wall 4-5-07 4/5/2007 31.36 Kb
|
|
|
|
|
|
Placing concrete for paved gutter 4-5-07 4/5/2007 31.48 Kb
|
Placing concrete for upper wall 3-30-07 3/30/2007 42.73 Kb
|
Power shovel excavating for secondary access road 3-13-07 3/13/2007 30.39 Kb
|
View of Upper Wall textured surface 3-13-07 3/13/2007 36.59 Kb
|
View of snowy Phase I site 2/11/2007 48.22 Kb
|
|
|
|
|
|
Textured retaining wall 2/11/2007 39.81 Kb
|
Phase I site with snow cover 2/11/2007 46.4 Kb
|
Construction of textured panels continues 2/11/2007 44.04 Kb
|
Back filling upper retaining wall 2/11/2007 47.55 Kb
|
All Anchors installed in lower wall 2/11/2007 40.02 Kb
|
|
|
|
|
|
Textured concrete wall panels 1/14/2007 33.66 Kb
|
Preparing to place concrete 5th panel 1/9/2007 38.24 Kb
|
Placing concrete for textured panels 1/9/2007 33.22 Kb
|
Textured concrete panels on upper wall 1/11/2007 36.65 Kb
|
Performing stress test on lower wall anchors 1/11/2007 31.8 Kb
|
|
|
|
|
|
Drilling anchor holes in upper wall surface 12/11/2006 42.3 Kb
|
Drilling anchor hole on upper wall surface 12/11/2006 37.35 Kb
|
Installing rock anchor tendons in drill holes 12/11/2006 46.11 Kb
|
Hydraulic jack system stressing anchor tendons 12/11/2006 33.36 Kb
|
Testing rock anchors on upper wall 12/11/2006 34.61 Kb
|
|
|
|
|
|
First row of anchors installed on upper wall 12/11/2006 40.91 Kb
|
Excavating material away from upper wall 12/11/2006 47.15 Kb
|
Phase I access road located between upper and lower walls 12/11/2006 44.81 Kb
|
Installing first row of rock anchors in lower wall 12/11/2006 39.71 Kb
|
Alignment of retaining walls in aerial view 12/11/2006 47.79 Kb
|
|
|
|
|
|
Test panel form with textured liner 12/11/2006 40.45 Kb
|
Test panel with forms stripped away 12/11/2006 32.98 Kb
|
Test panel edge treatment 12/11/2006 30 Kb
|
Completed test panel 12/11/2006 30.6 Kb
|
Placing reinforcing steel bars prior to concrete pour 12/11/2006 37.79 Kb
|
|
|
|
|
|
Textured form liner applied to formwork for first panel 12/11/2006 36.13 Kb
|
Concrete placement for first textured wall panel 12/11/2006 36.37 Kb
|
Stripping formwork off of first textured panel 12/11/2006 32.56 Kb
|
First textured panel poured in place 12/11/2006 38.73 Kb
|
First textured wall panel as seen from Route 1428 12/11/2006 29.41 Kb
|
|
|
|
|
|
Initiating demolition of the BP station 12/11/2006 25.51 Kb
|
BP station demolition complete 12/11/2006 31.26 Kb
|
Placing new fill material at the BP station site 12/11/2006 31.31 Kb
|
Previous BP station ste seeded and mulched 12/11/2006 21.12 Kb
|
Test hole #7 8/11/2006 34.61 Kb
|
|
|
|
|
|
Installing anchor at test hole #21 8/11/2006 39.44 Kb
|
Hole #21 drilling 8/11/2006 34.45 Kb
|
H pile upper and lower retaining walls 8/11/2006 29.85 Kb
|
Drilling at test hole #21.JPG 8/11/2006 39.94 Kb
|
Upper wall alignment with wood lagging being installed 8/7/2006 35.85 Kb
|
|
|
|
|
|
Alignment of upper wall H-piling in place 8/7/2006 39.35 Kb
|
Phase I entrance onto Route 1428 with H-piling alignments 8/7/2006 37.09 Kb
|
Alignment of access road flanked by installed H-piling 8/7/2006 36.79 Kb
|
Aerial view of Phase I site with H-piling 8/7/2006 39.88 Kb
|
Wood lagging for retaining walls 7/14/2006 32.9 Kb
|
|
|
|
|
|
Welder cutting H-piling to correct length 7/14/2006 40.91 Kb
|
Steel rock-anchor rods for retaining walls 7/14/2006 41.04 Kb
|
Re-setting sized H-piling for upper retaining wall 7/14/2006 37.91 Kb
|
Precise measurement of H-piling with stadia rod 7/14/2006 37.89 Kb
|
Placing concrete at H-piling 7/14/2006 41.69 Kb
|
|
|
|
|
|
Performing concrete slump test 7/14/2006 32.27 Kb
|
Lower retaining wall H-piling alignment 7/14/2006 26.41 Kb
|
H-piling for the retaining walls 7/14/2006 31.67 Kb
|
Drilling holes for H-piling on upper wall 7/14/2006 44.4 Kb
|
Crane with H-piling on upper wall 7/14/2006 25.4 Kb
|
|
|
|
|
|
Corrosion protection liners for rock-anchor rods 7/14/2006 39.3 Kb
|
Alignment of upper wall H-piling 7/14/2006 30.66 Kb
|
Welders preparing H-piling for retaining wall 6/21/2006 32.68 Kb
|
Welders at H-piling for retaining walls 6/21/2006 35.65 Kb
|
Preparations underway for piling placement at Phase I site 6/21/2006 38.69 Kb
|
|
|
|
|
|
Contractor's equipment preparing to drive piling along wall alignment 6/21/2006 35.19 Kb
|
Display of project alternatives 6/2/2006 24 Kb
|
Martin PDT member talking with landowner 6/2/2006 26.42 Kb
|
Martin PDT member listening to landowners 6/2/2006 23.79 Kb
|
May 2006 Workshop meeting 6/2/2006 26.7 Kb
|
|
|
|
|
|
Phase I site - April 2006 5/18/2006 29.02 Kb
|
Manhole installation at Phase I Site 5/18/2006 39.29 Kb
|
Aerial View of Phase I site - April 2006 5/18/2006 45.93 Kb
|
Final grading of CAP building site 5/11/2006 34.14 Kb
|
CAP building site graded and seeded 5/11/2006 28.87 Kb
|
|
|
|
|
|
CAP building completely down 5/11/2006 28.98 Kb
|
R26N7 Mayo Hollow 5/5/2006 34.71 Kb
|
North-South cut face Redevelopment Site 5/5/2006 34.11 Kb
|
Nearing completion of CAP building demolition 5/5/2006 33.15 Kb
|
May 2006 demolition of CAP building 5/5/2006 31.46 Kb
|
|
|
|
|
|
March 2006 Access Road 5/5/2006 39.93 Kb
|
Fork-lift equipment used in demolition process 5/5/2006 37.58 Kb
|
Demolition Contractor dismantling the CAP building 5/5/2006 30.9 Kb
|
Utilities installation on Phase I site March 2006 4/14/2006 47.26 Kb
|
Center cut with new hydroseeding (blue tint) 4/14/2006 38.67 Kb
|
|
|
|
|
|
Transition to North-South cut - utilities excavation and hydroseeding (blue) 4/14/2006 33.78 Kb
|
March 2006 Phase I site entrance area 4/14/2006 29.33 Kb
|
Flagging for retaining wall alignment Phase I site 4/14/2006 26.54 Kb
|
View of East-West Cut, January 2006 2/24/2006 42.8 Kb
|
Phase I Site with Downtown Martin in background 2/24/2006 44.11 Kb
|
|
|
|
|
|
Phase I Redevelopment Site, January 2006 2/24/2006 43.08 Kb
|
Nearing Completion of North-South Cut Excavation, January 2006 2/24/2006 53.21 Kb
|
Nearing Completion of Filling at Mayo Hollow, January 2006 2/24/2006 43.82 Kb
|
Mayo Hollow in January 2006 2/24/2006 29.49 Kb
|
R18N13 Mayo Hollow 100 Res 10/5/2005 37.67 Kb
|
|
|
|
|
|
R18N12 Mayo Hollow 100 Res 10/5/2005 31.95 Kb
|
View of the North-South cut from the center cut 10/5/2005 32.9 Kb
|
View of the North-South cut face 10/5/2005 32.18 Kb
|
View of the East-West cut from the center cut 10/5/2005 34.29 Kb
|
View of Martin from East-West cut 10/5/2005 31.65 Kb
|
|
|
|
|
|
Soil covering on rock bench in center cut. 10/5/2005 35.68 Kb
|
Loading material on North-South cut 10/5/2005 38.13 Kb
|
Loading material at the center cut area 10/5/2005 38.66 Kb
|
Center cut face 10/5/2005 39.19 Kb
|
Trucks unloading at Mayo Hollow 8/23/2005 39.3 Kb
|
|
|
|
|
|
Town of Martin and Phase I Site 8/23/2005 38.56 Kb
|
Removing Coal Seam on East-West Cut 8/23/2005 49.36 Kb
|
Excavator on North-South Cut 8/23/2005 42.7 Kb
|
Aerial View of Phase I Site 8/23/2005 38.31 Kb
|
Wall, East-West cut 7/27/2005 31.69 Kb
|
|
|
|
|
|
Trucks unloading at spoil site 7/27/2005 30.23 Kb
|
Route 1428 washed through town 7/27/2005 27.58 Kb
|
Excavation on North-South cut 7/27/2005 27.11 Kb
|
Excavating coal seam on East-West cut 7/27/2005 38.24 Kb
|
Phase I Redevelopment Site Excavation June 2005 7/13/2005 51.46 Kb
|
|
|
|
|
|
Ongoing Excavation of the East-West Cut Slope 7/13/2005 51.9 Kb
|
Downtown Martin, KY with Phase I Site in Foreground 7/13/2005 55.33 Kb
|
Mayo Hollow Temporary Spoil Area 7/13/2005 49.63 Kb
|
Workshop attendance by Martin business owners 6/24/2005 26.39 Kb
|
Business owners in Martin attending Workshop 6/24/2005 28.66 Kb
|
|
|
|
|
|
Woody tree species repopulating slopes 6/23/2005 47.74 Kb
|
Sumac repopulating cut slopes 6/23/2005 50.72 Kb
|
Rye, fescue and clover mixture germination 6/23/2005 53.29 Kb
|
High stem count on seeded slopes 6/23/2005 60.33 Kb
|
Methodist church demolition 6/23/2005 33.98 Kb
|
|
|
|
|
|
Methodist Church and parsonage sites after seeding 6/23/2005 26.58 Kb
|
Excavation above the first coal seam on East/West cut 6/23/2005 44.81 Kb
|
Excavating loose soil on the East/West bench 6/23/2005 36.55 Kb
|
Drilling a production shot on the East/West cut 6/23/2005 39.64 Kb
|
Drilling blast pattern on North/South cut 6/23/2005 33.34 Kb
|
|
|
|
|
|
Dozer grading steep slope on East/West cut. 6/23/2005 41.4 Kb
|
Blasting crew inserting explosives for production shot 6/23/2005 36.04 Kb
|
Methodist parsonage demolition 6/22/2005 35.89 Kb
|
Jan's Flowershop demolition complete 6/22/2005 41.94 Kb
|
Excavating material above first coal seam East/West cut 6/22/2005 41.91 Kb
|
|
|
|
|
|
Endloader waiting for next truck 6/22/2005 40.39 Kb
|
Drilling angled pre-split holes on North/South face 6/22/2005 37.83 Kb
|
Christian Appalachian Project structure purchased for project 6/22/2005 32.22 Kb
|
Topsoil on benches at North/South cut 6/20/2005 45 Kb
|
Seed mixture growing on East/West cut 6/20/2005 37.48 Kb
|
|
|
|
|
|
Rock faces on North/South cut 6/20/2005 33.93 Kb
|
Rock face curve on North/South cut 6/20/2005 44.42 Kb
|
Placing spoil material at Mayo Hollow 6/20/2005 32.05 Kb
|
Excavation on East/West cut 6/20/2005 45.4 Kb
|
Endloader working on East/West cut 6/20/2005 44.29 Kb
|
|
|
|
|
|
Corps employee describing rock fractures to consultants 6/20/2005 41.04 Kb
|
Working on North/South cut 6/13/2005 33.68 Kb
|
Trucks lining up to load at East/West cut 6/13/2005 40.04 Kb
|
Shovels on North/South cut 6/13/2005 41.59 Kb
|
Shot 109, East/West cut 6/13/2005 31.8 Kb
|
|
|
|
|
|
Shot 81 and 82, East/West cut 6/13/2005 22.87 Kb
|
Powershovel working on North/South cut 6/13/2005 29.59 Kb
|
North/South cut 6/13/2005 34.18 Kb
|
Measuring coal seam on North/South cut 6/13/2005 48.25 Kb
|
Hydroseeding, East/West cut 6/13/2005 34.08 Kb
|
|
|
|
|
|
Hydroseeding at drainage swale, East/West cut 6/13/2005 31.42 Kb
|
First grass on East/West cut area 6/13/2005 54.08 Kb
|
East/West cut faces 6/13/2005 35.69 Kb
|
East/West cut during shot 6/13/2005 32.25 Kb
|
Drilling the point on East/West cut area 6/13/2005 38.62 Kb
|
|
|
|
|
|
Drill rigs on East/West cut area 6/13/2005 45.93 Kb
|
Detonation of shot on East/West Cut 6/13/2005 31.64 Kb
|
Cut East/West Loading 6/13/2005 33.17 Kb
|
Sandstone rock face and topsoil bench on East/West cut 3/15/2005 43 Kb
|
Downslope on East/West cut 3/15/2005 51.31 Kb
|
|
|
|
|
|
Drilling and excavating on North/South cut 3/15/2005 52.89 Kb
|
Endloader filling dump on East/West cut 3/15/2005 62.84 Kb
|
View north from East/West cut 3/15/2005 44.96 Kb
|
Endloader working debris on East/West cut 3/15/2005 37.69 Kb
|
Sandstone rock face on North/South cut 3/15/2005 57.41 Kb
|
|
|
|
|
|
Powershovel on North/South cut 3/15/2005 46.84 Kb
|
Excavation of East/West cut slope 3/15/2005 62.46 Kb
|
Powershovel and ramhoe on North/South cut 3/15/2005 56.2 Kb
|
Drilling blast pattern on North/South cut 3/15/2005 52.56 Kb
|
Preparing seismic instruments 3/15/2005 63.51 Kb
|
|
|
|
|
|
Hauling spoil material into Mayo Hollow 3/15/2005 59.58 Kb
|
Retention Pond at Mayo Hollow 3/15/2005 52.49 Kb
|
East/West Cut 3/15/2005 28.74 Kb
|
North/South cut View 3/9/2005 37.95 Kb
|
Looking from North/South cut to East/West cut 3/3/2005 52.99 Kb
|
|
|
|
|
|
Work on East/West cut 2/25/2005 44.11 Kb
|
Truck backing up on North/South cut 2/24/2005 34.58 Kb
|
North/South Layout 2/9/2005 45 Kb
|
Redevelopment Site Aerial 2/11/2005 43.06 Kb
|
Redevelopment Site Aerial 2/11/2005 44.02 Kb
|
|
|
|
|
|
Redevelopment Site 2/11/2005 55.24 Kb
|
Pre-split 2/2/2005 25.43 Kb
|
North/South cut 2/9/2005 37.09 Kb
|
Load for shot on East/West Side 2/10/2005 45.65 Kb
|
Hoe loading truck on North/South cut 2/24/2005 34.35 Kb
|
|
|
|
|
|
E-W haul road looking from North/South Cut 2/23/2005 39.51 Kb
|
Drill Rigs on East/West Cut 2/11/2005 38.73 Kb
|
Drill Rigs on North/South Cut 2/23/2005 42.73 Kb
|
Phase I: Drilling Hole with Two Drills 2/1/2005 41.88 Kb
|
Phase I: Excavator on N-S Cut 2/1/2005 42.84 Kb
|
|
|
|
|
|
Phase I: Load Truck at N-S Redevelopment 1/31/2005 54.58 Kb
|
Phase I: Hoe Ramming Rock 2/1/2005 42.53 Kb
|
Phase I 1/28/2005 28.92 Kb
|
Phase I 1/28/2005 31.87 Kb
|
Phase I: Drilling at Hole 1/28/2005 34.12 Kb
|
|
|
|
|
|
Phase I: Trucks and Loader 1/27/2005 61.98 Kb
|
Phase I: Mayo Hollow Pond 1/25/2005 38.59 Kb
|
Phase I: Loading Materials 1/25/2005 47.86 Kb
|
Phase I: Haul Road 1/25/2005 34.69 Kb
|
Phase I: Drill Rig 2/1/2005 37.43 Kb
|
|
|
|
|
|
Phase I: Haul Road at Mayo Hollow 1/31/2005 49.92 Kb
|
Phase I: Removing Rock at Phase I Site Entrance 1/17/2005 34.78 Kb
|
Phase I: Trucks Unloading at Mayo Hollow Spoil Site 1/17/2005 32.59 Kb
|
Phase I: Dozer Cutting Benches at Mayo Hollow 1/14/2005 51 Kb
|
Phase I: Water Level at Mayo Hollow 1/14/2005 25.09 Kb
|
|
|
|
|
|
Phase I: Pond Area at Mayo Hollow 1/13/2005 34.71 Kb
|
Phase I: Riser at Mayo Hollow 1/11/2005 47.83 Kb
|
Phase I: Pouring Concrete for Riser Pip Footer at Mayo Hollow 1/10/2005 54.16 Kb
|
Phase I: Riser Pipe Before Pouring Concrete at Mayo Hollow 1/10/2005 35.88 Kb
|
Phase I: Discharge Pipe at Mayo Hollow 1/14/2005 43.26 Kb
|
|
|
|
|
|
Phase I: View of Redevelopment Excavation Site 1/7/2005 33 Kb
|
Phase I: View of Redevelopment Cut 1/7/2005 37.84 Kb
|
Phase I: Redevelopment Cut Site 1/7/2005 43.65 Kb
|
Phase I: Aerial view of downtown Martin and Phase I site. 12/15/2004 47.83 Kb
|
Phase I: Aerial view of downtown Martin and Phase I site. 12/15/2004 56.81 Kb
|
|
|
|
|
|
Phase I: Aerial view of Phase I site. 12/15/2004 58.33 Kb
|
Phase I: Aerial view of Mayo Hollow. 12/15/2004 56.43 Kb
|
Phase I: Upstream side of the sediment retention structure at May Hollow 12/15/2004 46.48 Kb
|
Phase I: Riser Pipe at Mayo Hollow 12/15/2004 45.92 Kb
|
Phase I: First Blasts 12/15/2004 34.36 Kb
|
|
|
|
|
|
Phase I: Downtown Martin 12/8/2004 49.62 Kb
|
Phase I: 1428 & 80 Connector 12/8/2004 53.86 Kb
|
Phase I: Contractor's Office 12/7/2004 41.84 Kb
|
Phase I: Contractor's December 7, 2004 Public Meeting on Blasting 12/7/2004 29.26 Kb
|
Phase I: Temporary Parking Lot 11/29/2004 37.07 Kb
|
|
|
|
|
|
spillway 11-17-04 11/23/2004 42.91 Kb
|
starting to place riprap at spillway 11-17-04 11/23/2004 29.7 Kb
|
upstream area of pond 11-16-04 11/18/2004 31.71 Kb
|
pond area 11-10-04 11/17/2004 37.12 Kb
|
concrete at 36 inch pipe 11-11-04 11/17/2004 36.15 Kb
|
|
|
|
|
|
Placing rebar at 36 inch pipe 11-10-04 11/17/2004 38.01 Kb
|
compacting clay fill on dike 11-16-04 11/17/2004 28.33 Kb
|
view of dam and pond site mayo 10-07-04 11/10/2004 42.33 Kb
|
Turn in to Mayo Spoil siite 10-06-04 11/10/2004 38.46 Kb
|
Temp Road 10-25-04 11/10/2004 32.25 Kb
|
|
|
|
|
|
loading fill materail 10-26-04 11/10/2004 45.36 Kb
|
geo grid 10--25-04 11/10/2004 42.46 Kb
|
first lift dike area 10-26-04 11/10/2004 43.79 Kb
|
Dam area after rain 10-26-04 11/10/2004 29.49 Kb
|
Construction - HDPE 11-05-04 11/10/2004 44.62 Kb
|
|
|
|
|
|
Construction - excavating for 36 inch pipe 11-05-2004 11/10/2004 34.4 Kb
|
aggregate for 36 inch pipe mayo 11-05-04 11/10/2004 36.19 Kb
|
aggregate bedding 11-5-04 11/10/2004 45.82 Kb
|
Valley View - Williamson, WV 8/18/2004 52.49 Kb
|
Valley View - Williamson, WV 8/13/2004 56.33 Kb
|
|
|
|
|
|
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site. 8/9/2004 48.02 Kb
|
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site. 8/9/2004 46.04 Kb
|
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site. 8/9/2004 36.12 Kb
|
Excavation of the old fire station at and the adjacent hillside as part of the redevelopment site. 8/9/2004 47.19 Kb
|
New temporary fire station and Corps field office (at far end of the building) located on 1428 between downtown and Mayo Hollow. 8/9/2004 35.21 Kb
|
|
|
|
|
|
Phase I site (longshot) 8/9/2004 37.33 Kb
|
Phase I site looking down 1428 through the heart of Martin Downtown. 8/9/2004 56.69 Kb
|
Phase I site looking down 1428 through the heart of Martin Downtown (close up). 8/9/2004 41.17 Kb
|
Phase I Site Clearing 8/9/2004 59.79 Kb
|
Phase I Site Clearing 8/9/2004 59.79 Kb
|
|
|
|
|
|
Phase I Site Clearing 8/9/2004 74.58 Kb
|
Phase I Site Clearing 8/9/2004 63.83 Kb
|
Phase I Site Clearing 8/9/2004 66.31 Kb
|
Phase I Site Clearing 8/9/2004 58.29 Kb
|
Phase I Site Clearing 8/9/2004 50.6 Kb
|
|
|
|
|
|
Groundbreaking festivities by the Honorable Guests. 8/9/2004 49.54 Kb
|
Judge Executive Paul Hunt Thompson 8/9/2004 37.33 Kb
|
Hon. John P. Woodley 8/9/2004 39.91 Kb
|
Dr. Varia and Mayor Robinson 8/9/2004 47.1 Kb
|
Congressman Hal Rogers 8/9/2004 44.96 Kb
|
|
|
|
|
|
Colonel William Bulen 7/10/2004 41.28 Kb
|