Photo Gallery :
Leave Gallery
View by:
Results per page:  5 | 10 | 15 | 20 | All
Page:  1  2  3  4  5  6  7  8  9  [10]  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  
Displaying 136 - 150 of 371
Initiating demolition of the BP station
BP station demolition complete
Placing new fill material at the BP station site
Previous BP station ste seeded and mulched
Test hole #7
Initiating demolition of the BP station
12/11/2006
25.51 Kb
BP station demolition complete
12/11/2006
31.26 Kb
Placing new fill material at the BP station site
12/11/2006
31.31 Kb
Previous BP station ste seeded and mulched
12/11/2006
21.12 Kb
Test hole #7
8/11/2006
34.61 Kb
Installing anchor at test hole #21
Hole #21 drilling
H pile upper and lower retaining walls
Drilling at test hole #21.JPG
Upper wall alignment with wood lagging being installed
Installing anchor at test hole #21
8/11/2006
39.44 Kb
Hole #21 drilling
8/11/2006
34.45 Kb
H pile upper and lower retaining walls
8/11/2006
29.85 Kb
Drilling at test hole #21.JPG
8/11/2006
39.94 Kb
Upper wall alignment with wood lagging being installed
8/7/2006
35.85 Kb
Alignment of upper wall H-piling in place
Phase I entrance onto Route 1428 with H-piling alignments
Alignment of access road flanked by installed H-piling
Aerial view of Phase I site with H-piling
Wood lagging for retaining walls
Alignment of upper wall H-piling in place
8/7/2006
39.35 Kb
Phase I entrance onto Route 1428 with H-piling alignments
8/7/2006
37.09 Kb
Alignment of access road flanked by installed H-piling
8/7/2006
36.79 Kb
Aerial view of Phase I site with H-piling
8/7/2006
39.88 Kb
Wood lagging for retaining walls
7/14/2006
32.9 Kb
Page:  1  2  3  4  5  6  7  8  9  [10]  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  
Displaying 136 - 150 of 371
Leave Gallery