Photo Gallery :
Leave Gallery
View by:
< DATE >
Recent
Oldest
< ALL CATEGORIES >
Home
-Groundbreaking Ceremony
-Phase I
--Mayo Hollow
-Flood Protection: Other Communities
--Valley View - Williamson, WV
--Mate Creek - Matewan, WV
--Matewan Floodwall - Matewan, WV
--Pond Creek - S. Williamson, KY
Results per page:
5
|
10
|
15
|
20
|
All
Page:
1
2
3
4
5
6
7
[8]
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Displaying
106
-
120
of
371
Textured retaining wall
2/11/2007
39.81 Kb
Phase I site with snow cover
2/11/2007
46.4 Kb
Construction of textured panels continues
2/11/2007
44.04 Kb
Back filling upper retaining wall
2/11/2007
47.55 Kb
All Anchors installed in lower wall
2/11/2007
40.02 Kb
Textured concrete wall panels
1/14/2007
33.66 Kb
Preparing to place concrete 5th panel
1/9/2007
38.24 Kb
Placing concrete for textured panels
1/9/2007
33.22 Kb
Textured concrete panels on upper wall
1/11/2007
36.65 Kb
Performing stress test on lower wall anchors
1/11/2007
31.8 Kb
Drilling anchor holes in upper wall surface
12/11/2006
42.3 Kb
Drilling anchor hole on upper wall surface
12/11/2006
37.35 Kb
Installing rock anchor tendons in drill holes
12/11/2006
46.11 Kb
Hydraulic jack system stressing anchor tendons
12/11/2006
33.36 Kb
Testing rock anchors on upper wall
12/11/2006
34.61 Kb
Page:
1
2
3
4
5
6
7
[8]
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Displaying
106
-
120
of
371
Leave Gallery