Photo Gallery :
Leave Gallery
View by:
Results per page:  5 | 10 | 15 | 20 | All
Page:  1  2  3  4  5  6  7  8  [9]  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  
Displaying 121 - 135 of 371
First row of anchors installed on upper wall
Excavating material away from upper wall
Phase I access road located between upper and lower walls
Installing first row of rock anchors in lower wall
Alignment of retaining walls in aerial view
First row of anchors installed on upper wall
12/11/2006
40.91 Kb
Excavating material away from upper wall
12/11/2006
47.15 Kb
Phase I access road located between upper and lower walls
12/11/2006
44.81 Kb
Installing first row of rock anchors in lower wall
12/11/2006
39.71 Kb
Alignment of retaining walls in aerial view
12/11/2006
47.79 Kb
Test panel form with textured liner
Test panel with forms stripped away
Test panel edge treatment
Completed test panel
Placing reinforcing steel bars prior to concrete pour
Test panel form with textured liner
12/11/2006
40.45 Kb
Test panel with forms stripped away
12/11/2006
32.98 Kb
Test panel edge treatment
12/11/2006
30 Kb
Completed test panel
12/11/2006
30.6 Kb
Placing reinforcing steel bars prior to concrete pour
12/11/2006
37.79 Kb
Textured form liner applied to formwork for first panel
Concrete placement for first textured wall panel
Stripping formwork off of first textured panel
First textured panel poured in place
First textured wall panel as seen from Route 1428
Textured form liner applied to formwork for first panel
12/11/2006
36.13 Kb
Concrete placement for first textured wall panel
12/11/2006
36.37 Kb
Stripping formwork off of first textured panel
12/11/2006
32.56 Kb
First textured panel poured in place
12/11/2006
38.73 Kb
First textured wall panel as seen from Route 1428
12/11/2006
29.41 Kb
Page:  1  2  3  4  5  6  7  8  [9]  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  
Displaying 121 - 135 of 371
Leave Gallery