Photo Gallery :
Leave Gallery
View by:
< DATE >
Recent
Oldest
< ALL CATEGORIES >
Home
-Groundbreaking Ceremony
-Phase I
--Mayo Hollow
-Flood Protection: Other Communities
--Valley View - Williamson, WV
--Mate Creek - Matewan, WV
--Matewan Floodwall - Matewan, WV
--Pond Creek - S. Williamson, KY
Results per page:
5
|
10
|
15
|
20
|
All
Page:
1
2
3
4
5
6
7
8
[9]
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Displaying
121
-
135
of
371
First row of anchors installed on upper wall
12/11/2006
40.91 Kb
Excavating material away from upper wall
12/11/2006
47.15 Kb
Phase I access road located between upper and lower walls
12/11/2006
44.81 Kb
Installing first row of rock anchors in lower wall
12/11/2006
39.71 Kb
Alignment of retaining walls in aerial view
12/11/2006
47.79 Kb
Test panel form with textured liner
12/11/2006
40.45 Kb
Test panel with forms stripped away
12/11/2006
32.98 Kb
Test panel edge treatment
12/11/2006
30 Kb
Completed test panel
12/11/2006
30.6 Kb
Placing reinforcing steel bars prior to concrete pour
12/11/2006
37.79 Kb
Textured form liner applied to formwork for first panel
12/11/2006
36.13 Kb
Concrete placement for first textured wall panel
12/11/2006
36.37 Kb
Stripping formwork off of first textured panel
12/11/2006
32.56 Kb
First textured panel poured in place
12/11/2006
38.73 Kb
First textured wall panel as seen from Route 1428
12/11/2006
29.41 Kb
Page:
1
2
3
4
5
6
7
8
[9]
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Displaying
121
-
135
of
371
Leave Gallery